Plan a spring kitchenthis winter.

Book a December design consult, and we build when the ground thaws.

  • Columbus
  • Upper Arlington
  • Dublin
  • Worthington
  • Bexley
  • Clintonville
  • German Village

Which room are we planning?

Scroll, or pick one. The plan behind redraws for it.

Kitchens

Six to ten weeks on site

Read about kitchens

Layout
Walls opened, the island where people stand.
Cabinetry
Semi-custom or custom, measured twice.
Counters and tile
Templated once the cabinets are set.
The trades
Wiring, plumbing and venting on one schedule.

Baths

Three to five weeks on site

Read about baths

Showers and tubs
Conversions, curbless pans, soaking tubs.
Tile
Waterproofed before a tile goes up.
Vanities
Storage planned around your mornings.
Air and light
A fan vented outside, light to shave by.

Basements

Five to eight weeks on site

Read about basements

Dry first
A moisture check before any framing.
Framing and drywall
Access left at every shutoff.
Egress
Windows cut where a bedroom needs one.
The extras
A half bath, a wet bar, a media wall.
A carpenter marking a dark plank with a red pencil and a square at his bench
Every cabinet run is measured on site twice before anything is ordered.

What do people ask first?

Can we live at home during the work?

Most do. Zip walls seal the work off.

Is financing available?

Yes, through a lending partner.

What does the warranty cover?

Two years on our labor, in writing.

Why plan in winter?

Orders placed in winter arrive by spring.

A bright room of bare timber walls with small high windows, before finishes

Rather start after the holidays?

These December visits are still open.

December design consults

Ana confirms by phone within a business day.

  • Written fixed quote
  • Two-year labor warranty
  • Financing available
  • Permits pulled
Call usBook a consult