What goes into a kitchen remodel?

Layout, cabinets, counters and every trade between, run by one lead.

What is included?

Everything from the subfloor to the pendants.

Layout and plan
Walls opened, the island sized to the room.
Cabinetry
Semi-custom or custom, ordered after two measures.
Counters and backsplash
Templated once the boxes are set.
Wiring, plumbing, venting
A hood vented outside, light under every cabinet.

How does it run?

  1. Consult

    We measure the room and listen to how you use it.

  2. Design and quote

    Plans and a fixed, itemized price, usually within a week.

  3. Order

    Materials ordered and a written schedule before demolition.

  4. Build

    One project lead from the first day to the final walk.

A carpenter marking a dark plank with a red pencil and a square at his bench
Doors and fillers are scribed to your walls on site, not forced to fit.

What else do people ask?

  • Written fixed quote
  • Two-year labor warranty
  • Financing available
  • Permits pulled
How long is the kitchen out of use?

Six to ten weeks, with a temporary sink.

Can we reuse our appliances?

Often. We plan the openings around them.

Do you open load-bearing walls?

Yes, with an engineer and a permit.

Call usBook a consult