What goes into a kitchen remodel?
Layout, cabinets, counters and every trade between, run by one lead.
What is included?
Everything from the subfloor to the pendants.
- Layout and plan
- Walls opened, the island sized to the room.
- Cabinetry
- Semi-custom or custom, ordered after two measures.
- Counters and backsplash
- Templated once the boxes are set.
- Wiring, plumbing, venting
- A hood vented outside, light under every cabinet.
How does it run?
Consult
We measure the room and listen to how you use it.
Design and quote
Plans and a fixed, itemized price, usually within a week.
Order
Materials ordered and a written schedule before demolition.
Build
One project lead from the first day to the final walk.

What else do people ask?
- Written fixed quote
- Two-year labor warranty
- Financing available
- Permits pulled
How long is the kitchen out of use?
Six to ten weeks, with a temporary sink.
Can we reuse our appliances?
Often. We plan the openings around them.
Do you open load-bearing walls?
Yes, with an engineer and a permit.