What does a bathroom remodel cover?

Tile, showers, vanities and the plumbing behind them, built to stay dry.

What is included?

One room, every layer of it.

Showers and tubs
Conversions, curbless pans, soaking tubs.
Waterproofing and tile
A membrane behind every wet wall.
Vanities and storage
Drawers planned around your mornings.
Air and light
A fan ducted outside, light to shave by.

How does it run?

  1. Consult

    We measure the room and listen to how you use it.

  2. Design and quote

    Plans and a fixed, itemized price, usually within a week.

  3. Order

    Materials ordered and a written schedule before demolition.

  4. Build

    One project lead from the first day to the final walk.

A heap of cut terracotta and glazed tile offcuts
Tile is laid out on paper first, so cuts land at the edges, not the middle of a wall.

What else do people ask?

  • Written fixed quote
  • Two-year labor warranty
  • Financing available
  • Permits pulled
Can you turn our tub into a walk-in shower?

Yes, often with a bench and a niche.

What if there is rot under the floor?

We show you and price it first.

How long is the bathroom out of use?

Three to five weeks on site.

Call usBook a consult